Looking for a DATA LOGGER? Now see – www.hobodataloggers.com.au

RM-ET RTD Sensor for temperatures up to 400 Deg C and long lead lengths, made to order

These sensors are custom made to order. Please call us for pricing.
Part Number: RM-ET
Call for pricing
Product Files

RM-ET RTD Sensor

Normally used for temperatures above 260 Deg C (Max 400 Deg C) or sensors that require long lead lengths and are operating at temperatures over 100 deg C

Features:

  • 310 Stainless Steel Sheath
  • Choice of 3.0mm or 6.0mm Sheath Diameter
  • Choice of flexible lead types, PVC, Teflon, Fiberglass, Stainless Braid and Stainless speedo cable.
  • Plugs or tails can be fitted
  • Protection Spring option

RM-ET RTD Sensor

Normally used for temperatures above 260 Deg C (Max 400 Deg C) or sensors that require long lead lengths and are operating at temperatures over 100 deg C

Features:

  • 310 Stainless Steel Sheath
  • Choice of 3.0mm or 6.0mm Sheath Diameter
  • Choice of flexible lead types, PVC, Teflon, Fiberglass, Stainless Braid and Stainless speedo cable.
  • Plugs or tails can be fitted
  • Protection Spring option

Online store by DBG Technologies, powered by LiveCube